Motors and valves in practice: permissives, feedback and travel time
What every motor and valve block needs on a real project: permissives versus interlocks, run feedback with a timeout for failed-to-start, trip reset, valve travel time and position feedback, and local/remote.
Permissive or interlock?
The two words get used interchangeably on site, and that is an expensive mistake. The difference is when each one is checked:
| Permissive | Interlock |
|---|---|---|
Checked | only at the start command | every scan |
Effect | prevents starting | stops what is running |
Example | upstream valve is open | thermal overload tripped |
If it appears while running | nothing | it stops immediately |
Mix them up and you get either a motor that drops out for no reason because a start permissive went away mid-run, or a safety interlock that is ignored because it was only checked at the start. The second one hurts people.
Run feedback, and why it needs a timeout
You commanded the pump. Did it run? A digital output means the PLC asked, not that the shaft turned. Proof of running is run feedback: a contactor auxiliary contact, a flow switch, or a status word from the drive.
The right structure is: commanded, waited a sensible time, no feedback, therefore failed to start.
FbkDly(IN := CmdRun AND NOT RunFbk, PT := T#3s);
IF FbkDly.Q THEN
FailStart := TRUE;
END_IF;Three seconds suits a contactor; a large star-delta motor may want 8 to 12. The same timer also catches loss of feedback while running, which is what happens when the overload trips with the run command still on.
Trip reset
A latched fault does not clear itself, and it does not clear from the start button. Reset clears the fault and does not start. One press to clear, a second press on start to run. That means whoever pressed reset looked at the machine before starting it, which is the whole point.
Valves: travel takes time
A valve is not a digital output. You command it and it begins to move, and moving takes one to thirty seconds depending on size and actuator.
- With position feedback: two limit switches, ZSO and ZSC. The timeout is the stated travel time plus margin, typically 1.5 times. No limit switch at the end means a "failed to open" fault.
- Without position feedback: do not pretend you know the position. Use a timer as an estimate and name the variable
VlvAssumedOpen, notVlvOpen. - Impossible states are faults: both limits made means a failed switch or a shorted wire. Neither limit made after the timeout means the valve stuck mid-travel. Those are two separate faults.
Local and remote
The local/remote selector is not decoration, it is the basis of maintenance work. In local, the field station has control, and the PLC must be prevented from starting the motor even if SCADA asks. Interlocks still apply: local grants start authority, never the right to defeat safety.
And remember: a safety stop never goes through the PLC. The mushroom button, the pull-cord and the safety relay are wired into the contactor circuit directly, or into a certified safety controller. The PLC reads that the stop is active so it can display and log it. It is not relied on to do the stopping.
The lamp tells the state
Three states from one lamp: off means stopped, flashing means commanded with no feedback yet, steady means confirmed running. A technician reads that from across the room.
Try it in the lab
The lab runs in your browser: an ST editor, a virtual process that suits the lesson, the same program as a live ladder diagram, a watch table, and export to Siemens SCL.
What to try
- Run the program and press START: watch the current fall in star, then a small rise at the change to delta.
- Turn on OVERLOAD TRIP: everything stops and Fault latches. Turn it off, then press STOP to reset.
- Remove NOT KDelta from the KStar line and NOT KStar from the KDelta line, and use StarTmr.Q instead of GapT.Q: if the two overlap you get a SHORT Y+Δ.
- Try PT := T#0s for star: a direct start with a high current trips the overload relay.
Terms in this lesson
People find this lesson by searching
motor control block plc structured textpermissive vs interlock plcrun feedback timeout plcfailed to start fault logicvalve travel time plcvalve position feedback limit switchlocal remote selector plcpump start logic plc
Course outline
- 01What is Structured Text, and when to use it instead of ladder
- 02How a PLC runs your code: the scan cycle and the process image
- 03Program structure: POUs, PROGRAM, FUNCTION and FUNCTION_BLOCK
- 04Your first program: starting a pump with seal-in logic
- 05Data types: BOOL, INT, REAL, TIME and the rest
- 06Declaring variables: VAR, VAR_INPUT and RETAIN
- 07Literals and constants: 16#FF, 2#1010 and T#5s
- 08Type conversion and scaling a 4-20 mA signal
- 09Assignment and arithmetic in ST: := and operator precedence
- 10Boolean logic, comparisons and bit operations
- 11Standard functions: ABS, SQRT, MIN, MAX, LIMIT, SEL, MUX
- 12IF, ELSIF and ELSE: the rules and when to avoid them
- 13The CASE statement and your first state machine
- 14The FOR loop and the watchdog
- 15WHILE, REPEAT, EXIT, CONTINUE and RETURN
- 16Edge detection: R_TRIG, F_TRIG and the "it fired every scan" bug
- 17Timers: TON, TOF and TP
- 18Counters: CTU, CTD and CTUD
- 19SR and RS flip-flops: which one wins
- 20Writing your own function
- 21Writing a function block
- 22Arrays in Structured Text
- 23Structs and enumerations
- 24References and pointers
- 25The state machine pattern: a batch sequence that cannot get stuck
- 26Alarm management to ISA-18.2: delay, deadband, latch, acknowledge, first-out
- 27Analogue signal processing: counts to engineering units, NE43 and filtering
- 28Closed-loop control in ST: hysteresis first, then a practical PID
- 29Motors and valves in practice: permissives, feedback and travel time
- 30The same ST on every platform: SCL, Studio 5000, CODESYS, TwinCAT
- 31Testing and debugging ST: the watch table, forcing and simulation
- 32An ST style guide: naming, comments, constants and version control
- 33Final project: a complete tank station with a state machine and alarms
- 3420 interview questions on ST and PLC programming, with answers