Skip to content

04 · HMI-01 · SCADA & HMI

SCADA and HMI systems: screens an operator reads in a second

High-performance SCADA and HMI dashboards: live trends, alarm management following ISA-18.2 and automated reports, on Node-RED or custom web dashboards.

A good monitoring screen does not show everything; it shows what the operator needs to decide. I design in the high-performance HMI style: calm colours, attention only where something has left normal, and deliberate alarms that never flood the operator. HS-IIoT is a live example.

What I do

01

Live monitoring dashboards

Power, generators, tanks and pumps on one screen, in the browser or on a phone.

02

Alarm management

Priorities, on-delays against chattering, and instant Telegram notifications, following ISA-18.2 principles.

03

Trends and reports

Time-series storage, historical trends, and automated daily and monthly reports.

04

High-performance HMI design

Interfaces following ISA-101: quiet backgrounds, colour only where attention is needed.

Working with me

What you receive

  • A live monitoring dashboard that works in the browser and on a phone
  • An alarm list with priorities, and instant Telegram notifications
  • Historical trends and automatic daily and monthly reports
  • Screens designed to ISA-101 principles

How the work goes

  1. Understand the need

    The problem, the result you need, the existing equipment and the constraints, on a call or a visit.

  2. Survey the site or drawings

    Reading things as they are: panels, instruments, cables and network, before any design.

  3. A written proposal

    Scope, deliverables, time and cost in writing, before work starts.

  4. Build and test

    Built in stages, each part tested before moving on to the next.

  5. Commission and hand over

    Commissioning on site, documentation, and training for the people who will run it.

Standards

ISA-18.2ISA-101ISA-5.1

Technologies & skills

Node-REDReactMongoDBTime-series dataTelegram alertsDCSFluidNCAndroid KioskPyQt6PySide6

Try it yourself

Projects demonstrating this expertise

Related articles

Terms

FAQ

What is SCADA?

Supervisory Control And Data Acquisition: a system that collects data from controllers and sensors across a site, presents it to operators, and lets them send commands, manage alarms and keep history.

What is the difference between SCADA and DCS?

A DCS usually handles continuous, integrated control inside one plant such as a refinery; SCADA covers supervisory monitoring and control across distributed or wide sites. The line between them has blurred a lot.

What is ISA-18.2?

The standard for alarm management in the process industries: how alarms are designed, prioritised and reviewed so operators are not flooded with meaningless alarms.

Can generators be monitored from a phone?

Yes, that is exactly what HS-IIoT does: voltage, current, fuel and alarms reach the phone in real time.

Have a project in this area?

Write a few lines about the site and what you need; your request reaches me immediately.

Describe the problem, intended outcome, hardware or software, project location and proposed timeline. Requirements and scope are agreed after reviewing the details.

Send a request