Control & automation glossary

Hazardous-area, PLC, industrial-network and SCADA terms, explained plainly with examples from the field.

Hazardous areas (ATEX/IECEx)

ATEX
The European directive setting requirements for equipment used in explosive atmospheres; the name comes from the French ATmosphères EXplosibles.
IECEx
The international certification scheme for equipment in explosive atmospheres, run by the IEC and based on the IEC 60079 series of standards.
Equipment Protection Level (EPL)EPL
The equipment protection level states how safe a device is as an ignition source, and maps directly to the zones where it may be used.
Hazardous-area zones (Zone 0, 1, 2)
Dividing a site by the likelihood of an explosive atmosphere: Zone 0 continuously or for long periods, Zone 1 likely in normal operation, Zone 2 rarely and briefly.
Temperature class (T1 to T6)
The highest temperature a device’s surface can reach; it must stay below the auto-ignition temperature of the gas on site.
Gas groups (IIA, IIB, IIC)
Gases classified by how easily they ignite and pass a flame: IIA least severe (propane), IIB (ethylene), IIC most severe (hydrogen, acetylene).
Flameproof protection (Ex d)Ex d
A protection concept that lets an explosion happen inside the enclosure, which withstands it and cools the escaping flame through its gaps so the surrounding atmosphere does not ignite.
Intrinsic safety (Ex i)Ex i
A protection concept that limits the electrical energy in a circuit so it cannot produce an igniting spark or heat, even under fault conditions.

PLC programming & control

Programmable logic controller (PLC)PLC
An industrial computer built to control machines and processes: it reads sensors and switches, runs the control program, and drives motors and valves, repeatedly and reliably.
Structured Text (ST)ST
A textual programming language in IEC 61131-3 resembling Pascal, used for complex PLC logic, calculations and state machines.
PID controllerPID
A control algorithm that computes its output from the difference between the setpoint (SP) and the measured value (PV), in three parts: proportional, integral and derivative.
4-20 mA signal4-20 mA
The most widely used analogue signal in industrial measurement: 4 mA is the bottom of the range and 20 mA the top, and current, unlike voltage, is not affected by cable length.
HART protocolHART
A digital protocol carried on top of the 4-20 mA signal itself, allowing transmitter configuration, reading and diagnostics without interrupting the analogue measurement.
IEC 61131-3
The international standard that unified PLC programming: five languages, the data types, the program organization units and the standard function blocks.
Ladder logic (LD)LD
A graphical PLC language drawn like relay circuits: rails, contacts and coils. The most widely used language in maintenance.
Scan cycleScan
The loop a PLC repeats thousands of times a minute: read the inputs, run the program top to bottom, write the outputs.
Process image
A copy in controller memory of every input and output, refreshed once at the start and once at the end of each scan.
Watchdog timerWatchdog
A timer in the controller firmware that stops execution and raises a fault if one scan takes longer than allowed.
Task
The scheduling unit in a controller: which programs run, how often, and at what priority.
Program organization unit (POU)POU
The unit every piece of PLC code lives in. The standard defines three: PROGRAM, FUNCTION and FUNCTION_BLOCK.
Function block (FB)FB
A unit with inputs, outputs and internal memory that persists between scans, used by declaring an instance of it.
Function (FUN)FUN
A unit that takes inputs and returns one value with no memory at all: the same inputs always give the same result.
PROGRAM
The top program organization unit: bound to a task, executed cyclically, and keeping its variables between scans.
Seal-in (latch)
A pattern that keeps an output running after a momentary button press, by feeding the output back into its own start condition.
Interlock
A condition that prevents a device from starting, or stops it, to protect the process or people, whatever the operator wants.
Permissive
A condition that must be true before a device is allowed to start, but which does not stop it once it is running.
On-delay timer (TON)TON
A standard function block whose output Q becomes true after IN has stayed true for PT without interruption, and resets as soon as IN drops.
Off-delay timer (TOF)TOF
A block whose output Q stays true for PT after IN goes false, then drops.
Rising edge detection (R_TRIG)R_TRIG
A block whose output Q gives a one-scan pulse at the moment input CLK goes from false to true.
One-shot
Logic that performs an action once when an event happens, instead of every scan the condition stays true.
SR and RS flip-flopsSR / RS
Two standard blocks that hold a boolean state: SR is set-dominant, RS is reset-dominant.
State machine
A pattern where the process is in exactly one known state at a time and moves between states on defined conditions.
CASE statementCASE
A selection statement that runs one branch depending on an integer or enumerated value. It is what state machines in ST are built from.
IF statementIF
The conditional in ST: IF ... THEN ... ELSIF ... ELSE ... END_IF. The most used statement in the language.
Boolean expression
An expression whose result is TRUE or FALSE, built from comparisons and the operators AND, OR, XOR and NOT.
Operator precedence
The order an expression is evaluated in: brackets, then negation, then multiply and divide, then add and subtract, then comparisons, then AND, XOR and OR.
Integer division
Dividing two integers in ST gives an integer and the fraction is dropped, which is a common cause of an unexpected zero.
Type conversion
Explicit functions that move a value between types, such as INT_TO_REAL, REAL_TO_INT, TRUNC and TIME_TO_DINT.
Data type
The classification that fixes a variable size, value range and permitted operations: BOOL, INT, DINT, REAL, TIME and the rest.
Retained variable (RETAIN)RETAIN
A variable held in retentive memory, so it keeps its value through a power cut and restart.
Analogue scaling
Turning the raw count from an input card into an engineering unit an operator understands: metres, bar or degrees.
NAMUR NE43NE43
A recommendation defining current bands outside 4-20 mA that signal a sensor fault rather than a valid measurement.
Step timeout
A timer watching each step of a sequence: if the step does not finish in its expected time, raise a fault instead of waiting forever.
Alarm deadband
A gap between the value that raises an alarm and the value that clears it, so the alarm does not chatter around the trip point.
ISA-18.2
The alarm management standard for process industries: the alarm lifecycle from design to review, and the alarm rates considered acceptable.
Anti-windup
Handling that stops the integral term of a PID from growing without limit while the output is saturated at its high or low clamp.
Siemens SCLSCL
The Siemens name for Structured Text in TIA Portal and STEP 7: IEC 61131-3 compatible with its own conventions.
CODESYS
A vendor-independent IEC 61131-3 development environment, used as the base for many manufacturers including Beckhoff, WAGO and Schneider.

Industrial networks

Modbus protocolModbus
A simple, open industrial protocol dating from 1979: a client asks, servers answer from numbered registers. It runs over RS485 (RTU) or Ethernet (TCP).
MQTT protocolMQTT
A lightweight publish/subscribe messaging protocol through a broker, ideal for carrying sensor data from remote sites to a server.

SCADA & HMI

SCADA
Supervisory control and data acquisition: collects readings from distributed controllers and sensors, presents them to operators, and manages alarms, commands and history.

Industrial IoT

Edge computing
Processing data close to where it is produced, on site, instead of sending everything to the server: filtering, calculations and local decisions.